Trewin Design worked with Leadbitter and DCH in providing 93 new houses in a regeneration project on a former brownfield site in Bodmin. A previous masterplanning study undertook extensive tenant and community consultation throughout the design process.
- The site is 1.5ha including adopted highways on a steep sloping site.
- The project has achieved CSH Level 3 using solar design, energy and water saving measures, onsite renewables, recycling provisions and ‘A’ rated construction materials.
- The design appearance integrates well detailed buildings with quality social spaces to provide a distinctive place to live.